« To Do List | Main | Flamenco »

Long term construction plans

Maybe I should do more thorough investigation on what the hold-up is, but as I'm too busy with life, job and writing for Trippist, I'll just take the time to complain!
When oh when will Centraal Station be completed? Why must residents and visitors alike endure this ugly scaffolding, hiding a city treasure and greeting us with a first and last sight of mismanaged renovation?
All over Amsterdam, a town filled with visual stimulations and precious buildings, tourists and citizens also cannot miss the long-term, seemingly permanet fixures of city reconstruction, renovation and road-building. Or tunnel digging. Or tram line repairs.
Please, new-comers, don't be bothered by these sightly disturbances. Just learn to ignore them as most of us do on a regular basis, and hope that perhaps, one day, Amsterdam will be finished and we can enjoy it's beauty in full!
DSCF1434.JPG

TrackBack

TrackBack URL for this entry:
http://www.trippist.com/mt/mt-tb.cgi/482

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

About

This page contains a single entry from the blog posted on September 24, 2007 4:00 PM.

The previous post in this blog was To Do List.

The next post in this blog is Flamenco.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 3.31